Eddie Howe Flag Drop – Sandman Signature Newcastle
An 875m² Eddie Howe flag deployed at Sandman Newcastle, showcasing specialist rope access planning, rapid mobilisation and technical problem-solving.
01 - Challenge
The problem.
The project needed a large visual installation on a live city-centre hotel facade, with careful planning, safe access and coordination around a high-profile public event.
02 - Solution
What we did.
The project was undertaken by Custom Coatings & Maintenance, led by Paul Farrier, with fellow rope access specialist David Carter working alongside him. After arriving at Sandman Signature Newcastle at 5pm on Friday 28 March 2025, Paul and David met with the hotel team to establish the requirements for the display. With work due to begin at 7am on Saturday, the detailed rigging solution still needed to be developed. On Saturday morning, the team brought together the rope access equipment available between them and worked on site to devise a practical solution to the unusual suspension challenge. Using wire slings, Petzl Shunts and various other pieces of rope access equipment, they developed ten rigging arrangements across the building. Each arrangement connected one rope to three separate attachment points on the flag, creating a means of sharing the suspended load across 30 points. This approach was developed to address the challenge of displaying an enormous crowd surfing flag vertically beneath the hotel’s signage, despite the flag not having been manufactured for that purpose. During the deployment, Paul and David worked on ropes alongside the flag, with Chris Coburn coordinating from the rooftop and members of Wor Flags assisting with the operation. Winds reaching 40 mph caused the flag to balloon away from the building, while the fabric also became caught on the hotel’s exterior lighting. Despite these complications, the team successfully completed the flag drop, revealing the enormous Eddie Howe banner to the Newcastle United supporters gathered below. The project demonstrated the specialist experience, teamwork and practical problem solving that Paul and David now bring to Asset Access UK as its directors.
The Story Behind the Eddie Howe Flag Drop
This project was originally delivered in March 2025 by Custom Coatings & Maintenance, led by Paul Farrier, with David Carter working alongside him. Paul and David have since established Asset Access UK, bringing their combined rope access experience to the business.
From Gatwick to Newcastle
From Gatwick to Newcastle
On Thursday 27 March 2025, Paul Farrier and Chris Coburn were working at Sandman Signature Gatwick when Paul received an unexpected call about an ambitious plan to display an enormous 875m² Eddie Howe flag from Sandman Signature Newcastle during Newcastle United’s Carabao Cup victory celebrations.
Recognising the scale and unusual nature of the challenge, Paul contacted fellow rope access specialist David Carter to see whether he would be interested in helping deliver the display.
The following day, Paul returned to Newcastle, arriving at Sandman Signature Newcastle at approximately 5pm on Friday 28 March to meet the hotel team and establish what was required.
With work scheduled to begin at 7am on Saturday, there were just 14 hours between arriving at the hotel and the planned start.
The detailed rigging solution would have to be developed on site the following morning, leaving very little time to overcome a challenge unlike anything the team had previously undertaken.
An Unusual Technical Challenge
The flag had originally been manufactured as a crowd surfing banner, designed to be passed overhead by supporters. It was never intended to hang vertically from a building.
Sandman also required the flag to descend beneath the hotel’s rooftop signage, creating a further challenge involving the suspended weight and the positioning of the flag.
On Saturday morning, Paul and David gathered the rope access equipment available between them and developed a rigging solution on site.
Using wire slings, Petzl Shunts and specialist rope access equipment, they created ten arrangements across the building, each distributing a rope across three attachment points on the flag.
Battling 40 mph Winds
During the live display, winds reached 40 mph, causing the enormous flag to balloon away from the hotel façade.
The fabric also caught on the building’s exterior lighting, creating another complication during the deployment.
Paul and David worked on ropes alongside the flag, with Chris Coburn coordinating from the rooftop and members of Wor Flags assisting with maintaining tension.
Despite the challenges, the team successfully completed the display.
An Unforgettable Moment
As Eddie Howe’s image began appearing on the building, thousands of Newcastle United supporters erupted into celebration.
Paul, a lifelong Newcastle supporter, could see the crowd’s reaction reflected in the hotel’s windows while working alongside the flag.
It was a moment that would stay with everyone involved.
Supporting Tiny Lives Trust
Paul Farrier, David Carter and Chris Coburn chose to waive their fee for the flag drop and donate it to Tiny Lives Trust, supporting sick and premature newborn babies and their families.
Sandman Signature matched the donation, bringing the total raised to £3,360.
The Versatility of Rope Access
The project demonstrated how versatile rope access can be.
Beyond providing access to difficult locations, rope access offers the flexibility to tackle unusual technical challenges where conventional methods may be impractical.
Although this project was delivered by Custom Coatings & Maintenance before Asset Access UK was established, it reflects the experience, adaptability and practical problem solving that Paul and David bring to their business today.
Rope access isn’t just how we reach the job. It’s how we make challenging jobs possible.
Featured in the Media
Read the Sandman Signature article.
Read the Chronicle Live article.
03 - Results
The outcome.
“We have worked with Paul Farrier, director at Custom Coatings and Maintenance, for a while and we knew we needed specialist help for this.”